IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0418 # 02 Y:2006 02 2006 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $15,053 $0 n/a
AS0418 # 03 Y:2006 03 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,196 $0 n/a
AS0418 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,612 $550 n/a
AS0418 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,272 $1,000 n/a
AS0418 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,394 $1,900 n/a
AS0418 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,386 $3,000 n/a
AS0418 # 08 Y:2006 08 2006 USE SOLAR HEAT TO HEAT WATER $358 $2,800 n/a
AS0418 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,182 $15,913 n/a
NV0165 # 03 Y:2000 03 2000 RECYCLE WASTE INK AND CLEANUP SOLVENT $53,808 $145,915 n/a
NV0165 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140,415 $259,240 n/a
NV0165 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $544,084 $20,618 n/a
NV0127 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $704 $1,500 Implemented
NV0127 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $123 $222 Not Implemented
NV0127 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $1,216 $2,533 Not Implemented
NV0127 # 04 Y:1999 04 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,768 $588 Implemented
NV0127 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $375 $64 Not Implemented
NV0127 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $80 Not Implemented
NV0127 # 07 Y:1999 07 1999 INSTALL SKYLIGHTS $1,727 $3,945 Not Implemented
NV0127 # 08 Y:1999 08 1999 USE RADIANT HEATER FOR SPOT HEATING $3,636 $4,525 Implemented
NV0127 # 09 Y:1999 09 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,890 $0 Not Implemented
NV0127 # 10 Y:1999 10 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,343 $325 Implemented
NV0123 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $331 $170 Not Implemented
NV0123 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $500,000 $3,070,000 Not Implemented
NV0123 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,949 $164,000 Not Implemented
NV0123 # 03 Y:1999 03 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,829 $800 Not Implemented