IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,905

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0123 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $472 $0 Not Implemented
AM0123 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100 $100 Not Implemented
OK0336 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,033 $0 Implemented
OK0336 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,157 $7,830 Implemented
OK0336 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,221 $7,915 Implemented
OK0336 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,632 $10,000 Implemented
OK0336 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,951 $0 Implemented
OK0336 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $0 Implemented
AS0012 # 01 Y:1990 01 1990 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $2,892 $1,800 Implemented
AS0012 # 02 Y:1990 02 1990 INSULATE BARE EQUIPMENT $1,277 $63 Not Implemented
AS0012 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,531 $1,500 Not Implemented
AS0012 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,435 $2,241 Implemented
AS0012 # 05 Y:1990 05 1990 KEEP LAMPS AND REFLECTORS CLEAN $10,139 $10,940 Not Implemented
AS0012 # 06 Y:1990 06 1990 INSTALL SET-BACK TIMERS $1,718 $450 Not Implemented
AS0012 # 07 Y:1990 07 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $111 $107 Implemented
OK0317 # 01 Y:1990 01 1990 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $13,920 $31,500 Not Implemented
OK0317 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,265 $1,050 Implemented
OK0317 # 03 Y:1990 03 1990 INSTALL TURBULATORS $429 $675 Implemented
UD0313 # 01 Y:1990 01 1990 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,744 $20,000 Implemented
UD0313 # 02 Y:1990 02 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $700 Implemented
UD0313 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $240 Not Implemented
UD0313 # 04 Y:1990 04 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,376 $25,000 Implemented
UD0315 # 01 Y:1990 01 1990 INSTALL STORM WINDOWS AND DOORS $12,565 $12,000 Implemented
UD0315 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $50,970 $40,000 Implemented
UD0315 # 03 Y:1990 03 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,180 $70,000 Implemented