IAC logo
IAC Assessment: WI0135
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0135
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product COLOR PRINTING
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 21,000 Pieces
Production Hrs. Annual 4,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,897 815,358 kWh $0.07
Natural Gas $6,568 1,377 MMBtu $4.77
TOTAL ENERGY COSTS $61,465
RECOMMENDED SAVINGS* $6,907 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,907
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,306
Cost:
-
$3,138 - $168 - - - $3,138
-
kWh
$168
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$580
Cost:
$3,419
$870 12,896 - - $(-290) - $870
12,896
kWh
-
-
MMBtu
$(-290)
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,489
Cost:
-
$1,489 21,981 - - - - $1,489
21,981
kWh
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$498
Cost:
$1,280
$498 7,327 - - - - $498
7,327
kWh
-
-
MMBtu
-
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$399
Cost:
$1,400
$399 5,862 - - - - $399
5,862
kWh
-
-
MMBtu
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$314
Cost:
-
$314 - - - - - $314
-
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$321
Cost:
$400
- - $321 67 - - -
-
kWh
$321
67
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,907
Cost:
$6,499
$6,708 48,066 $489 67 $(-290) - $6,708
48,066
kWh
$489
67
MMBtu
$(-290)
-
$
TOTAL IMPLEMENTED Savings:
$6,907
Cost:
$6,499
$6,708 48,066 $489 67 $(-290) - $6,708
48,066
kWh
$489
67
MMBtu
$(-290)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes