IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0256 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,671 $1,000 Implemented
UA0256 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,976 $5,978 Implemented
UA0256 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $241 $540 Not Implemented
UA0256 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,430 $1,362 Not Implemented
UA0256 # 05 Y:2022 05 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $8,266 $1,440 Not Implemented
UA0056 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,045 $240 Implemented
UA0056 # 04 Y:2010 04 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,615 $2,000 Implemented
UA0056 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,084 $640 Not Implemented
UA0056 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $451 $900 Implemented
UA0056 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,865 $38,883 Implemented
GT0585 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,363 $74,200 Not Implemented
GT0585 # 09 Y:1996 09 1996 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE $11,350 $20,000 Not Implemented
GT0585 # 08 Y:1996 08 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $65,150 $150,000 Implemented
GT0585 # 07 Y:1996 07 1996 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $12,700 $27,000 Not Implemented
GT0585 # 06 Y:1996 06 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,520 $9,000 Not Implemented
GT0585 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,316 $25,922 Implemented
GT0585 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,120 $700 Implemented
GT0585 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $33,556 $59,500 Implemented
GT0585 # 01 Y:1996 01 1996 USE POWER DURING OFF-PEAK PERIODS $10,089 $0 Implemented
GT0310 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,930 $41,000 Not Implemented
GT0310 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $582 $2,216 Not Implemented
GT0310 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,325 $2,375 Not Implemented
GT0310 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $220 $140 Not Implemented
GT0310 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,080 $2,000 Not Implemented
GT0310 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,060 $300 Not Implemented