Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
184
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0586 # 06 Y:2022 | 06 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $24,960 | $4,480 | Implemented |
UF0586 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,260 | $25,400 | Implemented |
UF0586 # 05 Y:2022 | 05 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,306 | $9,876 | Implemented |
UF0586 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,260 | $6,608 | Not Implemented |
UF0586 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,172 | $297,040 | Not Implemented |
UF0586 # 02 Y:2022 | 02 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,066 | $12,420 | Implemented |
UF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $11,660 | $40,000 | Not Implemented |
UF0569 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,925 | $25,340 | Not Implemented |
UF0569 # 07 Y:2021 | 07 | 2021 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Implemented |
UF0569 # 03 Y:2021 | 03 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $16,113 | $14,830 | Not Implemented |
UF0569 # 09 Y:2021 | 09 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,071 | $495 | Implemented |
UF0569 # 10 Y:2021 | 10 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,868 | $0 | Implemented |
UF0569 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,252 | $1,985 | Implemented |
UF0569 # 11 Y:2021 | 11 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,822 | $0 | Implemented |
UF0569 # 04 Y:2021 | 04 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,766 | $5,229 | Implemented |
UF0569 # 08 Y:2021 | 08 | 2021 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,742 | $3,746 | Not Implemented |
UF0569 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,828 | $23,023 | Implemented |
UF0522 # 01 Y:2018 | 01 | 2018 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $36,742 | $240,000 | Not Implemented |
UF0522 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,070 | $48,000 | Not Implemented |
UF0522 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,481 | $1,413 | Implemented |
UF0522 # 10 Y:2018 | 10 | 2018 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $60,514 | $190,580 | Not Implemented |
UF0522 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $87,600 | $7,358 | Not Implemented |
UF0522 # 06 Y:2018 | 06 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,837 | $0 | Implemented |
UF0522 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,267 | $0 | Implemented |
UF0522 # 05 Y:2018 | 05 | 2018 | INSTALL SKYLIGHTS | $9,473 | $48,000 | Not Implemented |