IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
SIC 2754 Commercial Printing, Gravure
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0153 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,506 $25,512 Not Implemented
OD0153 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $20 Not Implemented
OD0153 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $405 $285 Not Implemented
OD0153 # 04 Y:2000 04 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $439 $420 Not Implemented
OD0153 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $427 $538 Not Implemented
OD0153 # 06 Y:2000 06 2000 SELL COMBUSTIBLE WASTE $8,442 $0 Not Implemented
OD0153 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,319 $0 Implemented
HO0218 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,368 $41,546 Implemented
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented
HO0218 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $4,499 $2,640 Implemented
HO0218 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,069 $0 Implemented
HO0218 # 05 Y:2000 05 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,825 $5,000 Not Implemented
HO0218 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,400 $20,000 Not Implemented
HO0218 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $37,179 $0 Implemented
OD0148 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,808 $43,334 Not Implemented
OD0148 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,160 $1,495 Not Implemented
OD0148 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $446 $308 Not Implemented
OD0148 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $1,954 $504 Not Implemented
OD0148 # 05 Y:1999 05 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,090 $450 Not Implemented
OD0148 # 06 Y:1999 06 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $368 $90 Not Implemented
OD0148 # 07 Y:1999 07 1999 METER WASTE WATER $4,026 $4,595 Not Implemented
UD0503 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $4,355 $4,000 Implemented
UD0503 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,164 $12,748 Not Implemented
UD0503 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-368 $10,000 Implemented
UD0503 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $449 $500 Not Implemented