IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

537

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0392 # 07 Y:2009 07 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,252 $392 Implemented
WV0392 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,192 $0 Implemented
WV0392 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $416 $283 Implemented
MA0645 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $6,990 $0 Implemented
MA0645 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,047 $0 Implemented
LE0269 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $112,626 $500,000 Implemented
LE0269 # 02 Y:2008 02 2008 $77,672 $600,000 Implemented
LE0269 # 04 Y:2008 04 2008 INSTALL TIMERS AND/OR THERMOSTATS $14,712 $250 Implemented
LE0269 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,284 $3,500 Implemented
LE0269 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,038 $900 Implemented
TT0019 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $2,000 Implemented
TT0019 # 04 Y:2008 04 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,835 $1,200 Implemented
MA0632 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,404 $14,500 Implemented
MA0632 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,265 $4,100 Implemented
MA0632 # 05 Y:2008 05 2008 REDUCE VENTILATION AIR $2,499 $9,000 Implemented
MA0632 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $383 $650 Implemented
WV0370 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $544,142 $5,500 Implemented
WV0370 # 02 Y:2008 02 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $416,253 $371,400 Implemented
WV0370 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $32,574 $3,560 Implemented
WV0370 # 05 Y:2008 05 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $21,799 $8,800 Implemented
WV0352 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,713 $170 Implemented
WV0352 # 03 Y:2006 03 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,862 $3,440 Implemented
WV0352 # 04 Y:2006 04 2006 DISCONNECT BALLASTS $1,803 $1,500 Implemented
WV0352 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,773 $1,431 Implemented
WV0352 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,241 $1,335 Implemented