Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,216
matching recommendationsSIC | 2759 | Commercial Printing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0731 # 15 Y:2005 | 15 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $0 | Implemented |
UD0731 # 16 Y:2005 | 16 | 2005 | DISCONNECT BALLASTS | $440 | $66 | Not Implemented |
LE0223 # 01 Y:2005 | 01 | 2005 | USE SOLAR HEAT TO MAKE ELECTRICTY | $444,462 | $1,100,000 | Not Implemented |
LE0223 # 02 Y:2005 | 02 | 2005 | REPLACE BOILER | $5,753 | $74,500 | Not Implemented |
LE0223 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,650 | $50 | Implemented |
LE0223 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,831 | $2,500 | Implemented |
LE0223 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,281 | $100 | Implemented |
LE0223 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,391 | $250 | Implemented |
LE0223 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $844 | $80 | Implemented |
LE0223 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $1,000 | Implemented |
LE0223 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $375 | $300 | Implemented |
LE0223 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $0 | Implemented |
WI0491 # 01 Y:2005 | 01 | 2005 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $23,636 | $25,000 | Not Implemented |
WI0491 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,939 | $15,000 | Not Implemented |
WI0491 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,911 | $5,000 | Implemented |
WI0491 # 04 Y:2005 | 04 | 2005 | IMPROVE LUBRICATION PRACTICES | $1,322 | $2,340 | Not Implemented |
WI0491 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $1,112 | $1,680 | Implemented |
WI0491 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $706 | $1,244 | Implemented |
IC0097 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,330 | $700 | Implemented |
IC0097 # 02 Y:2005 | 02 | 2005 | ISOLATE HOT OR COLD EQUIPMENT | $1,426 | $3,768 | Not Implemented |
IC0097 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,092 | $41,838 | Implemented |
IC0097 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,151 | $5,789 | Not Implemented |
IC0097 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM TEMPERATURE | $163 | $1,044 | Not Implemented |
SU0192 # 01 Y:2004 | 01 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $65,154 | $9,000 | Implemented |
SU0192 # 02 Y:2004 | 02 | 2004 | INSTALL OCCUPANCY SENSORS | $3,355 | $1,049 | Not Implemented |