IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
SIC 276 Manifold Business Forms
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0252 # 02 Y:2007 02 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $81,010 $98,750 Not Implemented
LE0252 # 01 Y:2007 01 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $116,900 $500 Implemented
LE0145 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,033 $3,718 Implemented
LE0145 # 06 Y:2002 06 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,306 $10,000 Not Implemented
LE0145 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,000 $0 Not Implemented
LE0145 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,018 $920 Not Implemented
LE0145 # 03 Y:2002 03 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,820 $0 Implemented
LE0145 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $929 $1,000 Not Implemented
LE0145 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,365 $0 Implemented
NC0231 # 01 Y:2002 01 2002 DEVELOP A REPAIR/REPLACE POLICY $2,088 $2,383 Not Implemented
NC0231 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $324 $736 Not Implemented
NC0231 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,818 $830 Not Implemented
NC0231 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,994 $200 Not Implemented
NC0231 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,626 $0 Implemented
TA0018 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $230 $20 n/a
TA0018 # 01 Y:2001 01 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,925 $0 n/a
TA0018 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $1,400 n/a
TA0018 # 03 Y:2001 03 2001 USE SYNTHETIC LUBRICANT $1,460 $0 n/a
TA0018 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,070 $0 n/a
TA0018 # 06 Y:2001 06 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $645 $0 n/a
TA0018 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $700 $0 n/a
TA0003 # 05 Y:2001 05 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,912 $4,110 n/a
TA0003 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $1,049 Not Implemented
TA0003 # 02 Y:2001 02 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,272 $0 Implemented
TA0003 # 01 Y:2001 01 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,177 $2,016 Implemented