IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 2761 Manifold Business Forms
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0502 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,147 $205 Implemented
IA0502 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $631 $3,164 Implemented
IA0502 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $155 Implemented
IA0502 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,996 $37,758 Implemented
IA0502 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,777 $405 Implemented
IA0502 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,859 $205 Implemented
IA0448 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,064 $560 Implemented
IA0448 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $21,840 $1,000 Implemented
IA0448 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,736 $1,440 Implemented
IA0448 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,798 $800 Implemented
IA0448 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,501 $6,360 Implemented
IA0216 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,677 $6,766 Implemented
IA0216 # 07 Y:1999 07 1999 RECOVER AND REUSE WASTE MATERIAL $15,502 $265 Implemented
IA0216 # 06 Y:1999 06 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $209,151 $182,650 Implemented
IA0216 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,823 $236 Implemented
KU0289 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,155 $1,600 Implemented
KU0289 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,454 $2,880 Implemented
KU0289 # 06 Y:1989 06 1989 INSTALL SET-BACK TIMERS $228 $40 Implemented