Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 2761 | Manifold Business Forms |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0502 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,147 | $205 | Implemented |
IA0502 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,996 | $37,758 | Implemented |
IA0502 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,777 | $405 | Implemented |
IA0502 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,859 | $205 | Implemented |
IA0502 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $796 | $155 | Implemented |
IA0502 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $629 | $700 | Not Implemented |
IA0502 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $631 | $3,164 | Implemented |
IA0448 # 01 Y:2010 | 01 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,064 | $560 | Implemented |
IA0448 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,840 | $1,000 | Implemented |
IA0448 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,986 | $50 | Not Implemented |
IA0448 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,736 | $1,440 | Implemented |
IA0448 # 05 Y:2010 | 05 | 2010 | REDUCE VENTILATION AIR | $1,274 | $2,000 | Not Implemented |
IA0448 # 06 Y:2010 | 06 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $2,798 | $800 | Implemented |
IA0448 # 07 Y:2010 | 07 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $371 | $1,000 | Not Implemented |
IA0448 # 08 Y:2010 | 08 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,763 | $2,360 | Not Implemented |
IA0448 # 09 Y:2010 | 09 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,501 | $6,360 | Implemented |
IA0216 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,677 | $6,766 | Implemented |
IA0216 # 07 Y:1999 | 07 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $15,502 | $265 | Implemented |
IA0216 # 06 Y:1999 | 06 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $209,151 | $182,650 | Implemented |
IA0216 # 05 Y:1999 | 05 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $5,826 | $7,750 | Not Implemented |
IA0216 # 04 Y:1999 | 04 | 1999 | INSTALL OCCUPANCY SENSORS | $657 | $399 | Not Implemented |
IA0216 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,089 | $50 | Not Implemented |
IA0216 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,823 | $236 | Implemented |
KU0289 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,155 | $1,600 | Implemented |
KU0289 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,454 | $2,880 | Implemented |