Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
SIC 278 Blankbooks And Bookbinding
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0083 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $923 $1,607 Not Implemented
WI0083 # 05 Y:1990 05 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,409 $4,908 Not Implemented
WI0083 # 06 Y:1990 06 1990 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $1,655 $2,000 Not Implemented
WI0083 # 07 Y:1990 07 1990 INSTALL SET-BACK TIMERS $338 $200 Not Implemented
WI0083 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $1,000 Not Implemented
UD0233 # 01 Y:1987 01 1987 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,942 $3,000 Implemented
UD0233 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,036 $0 Implemented
UD0233 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $450 $0 Implemented
CO0034 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,095 $250 Implemented
CO0034 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $963 $1,000 Not Implemented
CO0034 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,043 $4,000 Implemented
CO0034 # 04 Y:1985 04 1985 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $327 $200 Implemented
CO0034 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $250 $100 Not Implemented
CO0034 # 06 Y:1985 06 1985 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $888 $200 Not Implemented
CO0034 # 07 Y:1985 07 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $298 $600 Implemented
CO0034 # 08 Y:1985 08 1985 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $231 $300 Implemented
CO0034 # 09 Y:1985 09 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,196 $100 Implemented
CO0034 # 10 Y:1985 10 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $994 $100 Not Implemented
CO0034 # 11 Y:1985 11 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,434 $596 Implemented
ST0021 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,268 $160 Implemented
ST0021 # 02 Y:1985 02 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $327 $0 Not Implemented
ST0021 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $882 $537 Implemented
ST0021 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $455 $0 Implemented
ST0021 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,636 $35 Implemented
ST0021 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $845 $1,000 Implemented