Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | BINDERS |
NAICS | n/a |
SIC | 2782 - Blankbooks And Looseleaf Binders |
Sales | $10,000,000-$50,000,000 |
# of Employees | 392 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 600,000 Pieces |
Production Hrs. Annual | 3,400 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $139,917 | 1,380,129 | kWh | $0.10 |
Natural Gas | $6,602 | 983 | MMBtu | $6.72 |
Fuel Oil #4 | $35,259 | 6,048 | MMBtu | $5.83 |
TOTAL ENERGY COSTS | $181,778 | |||
RECOMMENDED SAVINGS* | $46,358 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,813 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,268 Cost: $160 |
$3,268 | 32,239 | - | - | - | - | - | - |
$3,268 32,239 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $327 Cost: - |
$327 | 3,224 | - | - | - | - | - | - |
$327 3,224 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $882 Cost: $537 |
- | - | - | - | $882 | 151 | - | - |
- - kWh |
- - MMBtu |
$882 151 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $455 Cost: - |
- | - | $455 | 69 | - | - | - | - |
- - kWh |
$455 69 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $2,636 Cost: $35 |
- | - | $2,636 | 400 | - | - | - | - |
- - kWh |
$2,636 400 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $845 Cost: $1,000 |
- | - | - | - | $239 | 41 | $606 | - |
- - kWh |
- - MMBtu |
$239 41 MMBtu |
$606 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $5,218 Cost: $1,900 |
$5,218 | - | - | - | - | - | - | - |
$5,218 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,291 Cost: $881 |
$17,291 | 170,574 | - | - | - | - | - | - |
$17,291 170,574 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $13,999 Cost: $625 |
- | - | - | - | $13,999 | 2,397 | - | - |
- - kWh |
- - MMBtu |
$13,999 2,397 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,437 Cost: $540 |
- | - | - | - | $1,437 | 246 | - | - |
- - kWh |
- - MMBtu |
$1,437 246 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,358 Cost: $5,678 |
$26,104 | 206,037 | $3,091 | 469 | $16,557 | 2,835 | $606 | - | $26,104 206,037 kWh |
$3,091 469 MMBtu |
$16,557 2,835 MMBtu |
$606 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,813 Cost: $3,778 |
$20,559 | 202,813 | $3,091 | 469 | $16,557 | 2,835 | $606 | - | $20,559 202,813 kWh |
$3,091 469 MMBtu |
$16,557 2,835 MMBtu |
$606 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||