IAC logo
IAC Assessment: ST0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product BINDERS
NAICS n/a
SIC 2782 - Blankbooks And Looseleaf Binders
Sales $10,000,000-$50,000,000
# of Employees 392
Plant Area (Sq.Ft.) 0
Annual Production 600,000 Pieces
Production Hrs. Annual 3,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,917 1,380,129 kWh $0.10
Natural Gas $6,602 983 MMBtu $6.72
Fuel Oil #4 $35,259 6,048 MMBtu $5.83
TOTAL ENERGY COSTS $181,778
RECOMMENDED SAVINGS* $46,358 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,813
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,268
Cost:
$160
$3,268 32,239 - - - - - - $3,268
32,239
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$327
Cost:
-
$327 3,224 - - - - - - $327
3,224
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$882
Cost:
$537
- - - - $882 151 - - -
-
kWh
-
-
MMBtu
$882
151
MMBtu
-
-
$
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$455
Cost:
-
- - $455 69 - - - - -
-
kWh
$455
69
MMBtu
-
-
MMBtu
-
-
$
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$2,636
Cost:
$35
- - $2,636 400 - - - - -
-
kWh
$2,636
400
MMBtu
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$845
Cost:
$1,000
- - - - $239 41 $606 - -
-
kWh
-
-
MMBtu
$239
41
MMBtu
$606
-
$
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,218
Cost:
$1,900
$5,218 - - - - - - - $5,218
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,291
Cost:
$881
$17,291 170,574 - - - - - - $17,291
170,574
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$13,999
Cost:
$625
- - - - $13,999 2,397 - - -
-
kWh
-
-
MMBtu
$13,999
2,397
MMBtu
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,437
Cost:
$540
- - - - $1,437 246 - - -
-
kWh
-
-
MMBtu
$1,437
246
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,358
Cost:
$5,678
$26,104 206,037 $3,091 469 $16,557 2,835 $606 - $26,104
206,037
kWh
$3,091
469
MMBtu
$16,557
2,835
MMBtu
$606
-
$
TOTAL IMPLEMENTED Savings:
$40,813
Cost:
$3,778
$20,559 202,813 $3,091 469 $16,557 2,835 $606 - $20,559
202,813
kWh
$3,091
469
MMBtu
$16,557
2,835
MMBtu
$606
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes