IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,013

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0674 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $225 $88 Implemented
WV0674 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $122 Implemented
WV0674 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $696 $1,133 Implemented
WV0674 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,766 $8,674 Implemented
WV0674 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $148 $482 Implemented
WV0674 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,374 $8,262 Implemented
WV0669 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,467 $940 Implemented
WV0669 # 17 Y:2024 17 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $135 $363 Implemented
WV0669 # 13 Y:2024 13 2024 OPTIMIZE PLANT POWER FACTOR $1,227 $5,535 Implemented
WV0669 # 12 Y:2024 12 2024 DEVELOP A REPAIR/REPLACE POLICY $1,463 $1,143 Implemented
WV0669 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,442 $5,225 Implemented
WV0669 # 14 Y:2024 14 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $843 $1,200 Implemented
WV0669 # 16 Y:2024 16 2024 INSULATE BARE EQUIPMENT $357 $798 Implemented
WV0669 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,886 $1,088 Implemented
WV0669 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $19,270 $9,950 Implemented
UD1089 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,974 $0 Implemented
LS2414 # 02 Y:2024 02 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $265,645 $63,000 Implemented
LS2414 # 04 Y:2024 04 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $810,158 $2,364,120 Implemented
UU0255 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,299 $2,614 Implemented
UU0255 # 01 Y:2024 01 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $64,548 $8,000 Implemented
UU0255 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,674 $8,711 Implemented
UU0255 # 08 Y:2024 08 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,932 $60,862 Implemented
UU0255 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,750 $4,964 Implemented
UU0255 # 04 Y:2024 04 2024 USE OPTIMUM THICKNESS INSULATION $10,948 $4,085 Implemented
UU0255 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,849 $4,680 Implemented