IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

337

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0513 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,283 $6,465 Implemented
UD0513 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,603 $19,910 Implemented
UD0513 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,228 $16,000 Implemented
UD0509 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,492 $3,080 Implemented
UD0509 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $1,600 Implemented
UD0509 # 07 Y:1996 07 1996 USE PHOTOCELL CONTROLS $1,279 $621 Implemented
UD0509 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,600 $5,000 Implemented
UD0509 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,840 $0 Implemented
UD0481 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $816 $240 Implemented
UD0459 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $9,255 $3,200 Implemented
UD0459 # 02 Y:1995 02 1995 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,913 $1,000 Implemented
UD0459 # 04 Y:1995 04 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,743 $340,000 Implemented
UD0459 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $545,061 $4,500,000 Implemented
UD0447 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $1,018 $1,500 Implemented
UD0447 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,206 $1,000 Implemented
UD0447 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,082 $0 Implemented
UD0447 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,451 $8,620 Implemented
UD0408 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,008 $1,500 Implemented
UD0408 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,052 $21,676 Implemented
UD0408 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $0 Implemented
UD0408 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,391 $10,000 Implemented
UD0408 # 05 Y:1993 05 1993 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $3,000 Implemented
UD0407 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,303 $6,000 Implemented
UD0407 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,300 $1,000 Implemented
UD0407 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,563 $500 Implemented