IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,864

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0163 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $2,440 $1,240 Implemented
AM0163 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $330 $0 Implemented
UF0045 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $216 Implemented
UF0045 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $1,354 Implemented
UF0045 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,185 $17,919 Implemented
UF0045 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,810 $325 Implemented
UF0045 # 06 Y:1992 06 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $585 $1,100 Implemented
ND0036 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,446 $22,730 Implemented
RU0165 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $617 $0 Implemented
RU0165 # 07 Y:1992 07 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,212 $2,500 Implemented
IA0037 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,697 $2,500 Implemented
IA0037 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,046 $3,050 Implemented
AS0067 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $793 $6,684 Implemented
AS0067 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,648 $6,290 Implemented
AS0067 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,425 $82,095 Implemented
AS0067 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $1,008 Implemented
AS0067 # 05 Y:1992 05 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,625 $2,031,000 Implemented
AS0067 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $264 $280 Implemented
AS0067 # 07 Y:1992 07 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,838 $7,000 Implemented
AS0067 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,956 $19,000 Implemented
AS0067 # 09 Y:1992 09 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,518 $5,000 Implemented
TN0469 # 01 Y:1992 01 1992 REPAIR OR REPLACE STEAM TRAPS $157,734 $15,225 Implemented
TN0469 # 02 Y:1992 02 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $94,476 $22,010 Implemented
TN0469 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $24,383 $7,272 Implemented
TN0469 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $11,943 $2,965 Implemented