Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
273
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0008 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $265 | $344 | Implemented |
SJ0008 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $365 | $0 | Implemented |
SD0621 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,319 | $0 | Implemented |
SD0621 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,887 | $10,000 | Implemented |
SD0611 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $203 | $387 | Implemented |
SD0611 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,193 | $22,050 | Implemented |
SD0611 # 06 Y:2021 | 06 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $45,722 | $186,400 | Implemented |
SD0611 # 07 Y:2021 | 07 | 2021 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,308 | $6,000 | Implemented |
SD0593 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,483 | $0 | Implemented |
SF0547 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,127 | $1,647 | Implemented |
SF0547 # 08 Y:2019 | 08 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $17,743 | $33,601 | Implemented |
SF0547 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $3,114 | $6,574 | Implemented |
SF0547 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,625 | $240 | Implemented |
SF0547 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,284 | $0 | Implemented |
SF0547 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,962 | $360 | Implemented |
SD0572 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,372 | $0 | Implemented |
SD0572 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $349 | $378 | Implemented |
SD0572 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,304 | $22,430 | Implemented |
SD0572 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $75,389 | $234,915 | Implemented |
SD0572 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $970 | $1,350 | Implemented |
SD0548 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,113 | $1,500 | Implemented |
SD0548 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,052 | $360 | Implemented |
SD0548 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $2,573 | $5,317 | Implemented |
SD0548 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,809 | $47,543 | Implemented |
SD0548 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $4,954 | $5,368 | Implemented |