Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0011 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,227 | $680 | n/a |
CC0011 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,203 | $5,000 | n/a |
CC0011 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,746 | $1,700 | n/a |
CC0011 # 05 Y:2022 | 05 | 2022 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $10,252 | $50,000 | n/a |
CC0011 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $754 | $0 | n/a |
CC0002 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,965 | $2,800 | n/a |
CC0002 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $954 | $0 | n/a |
CC0002 # 01 Y:2022 | 01 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,068 | $3,800 | n/a |
CC0002 # 04 Y:2022 | 04 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $106 | $180 | n/a |
CL2108 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $2,100 | n/a |
CL2108 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $1,049 | $3,565 | n/a |
CL2108 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,199 | $12,730 | n/a |
CL2108 # 04 Y:2021 | 04 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $182 | $520 | n/a |
CL2108 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,061 | $10,000 | n/a |
CL2108 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $947 | $0 | n/a |
CL2108 # 08 Y:2021 | 08 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $166 | $0 | n/a |
CL2108 # 06 Y:2021 | 06 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,453 | $0 | n/a |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
CL1910 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,560 | $23,063 | Implemented |
CL1910 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,387 | $1,900 | Implemented |
CL1910 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $377 | $1,605 | Implemented |