Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,080

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1096 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,551 $5,809 Not Implemented
UD1096 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,210 $242,106 Not Implemented
WV0674 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,766 $8,674 Implemented
WV0674 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,374 $8,262 Implemented
WV0674 # 03 Y:2024 03 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,331 $12,440 Not Implemented
WV0674 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $696 $1,133 Implemented
WV0674 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $658 $3,214 Not Implemented
WV0674 # 06 Y:2024 06 2024 UPGRADE CONTROLS ON COMPRESSORS $562 $2,318 Not Implemented
WV0674 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $122 Implemented
WV0674 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $225 $88 Implemented
WV0674 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $148 $482 Implemented
UU0258 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $158,000 $725,000 Not Implemented
UU0258 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $25,800 $6,200 Implemented
UU0258 # 03 Y:2024 03 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $12,600 $54,500 Implemented
UU0258 # 04 Y:2024 04 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,690,000 $23,500,000 Not Implemented
UU0258 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,890 $11,500 Implemented
UU0258 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,570 $5,140 Not Implemented
UU0258 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $120,000 $198,000 Implemented
UU0258 # 08 Y:2024 08 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $180,000 $20,000 Not Implemented
SD0661 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $641,754 $589,764 Implemented
SD0661 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $1,321,862 $54,390 Implemented
SD0661 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,348 $676 Implemented
SD0661 # 04 Y:2024 04 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,584 $4,191 Not Implemented
SD0661 # 05 Y:2024 05 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,205 $0 Implemented
SD0661 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,354 $0 Implemented