Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,673
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0019 # 08 Y:2008 | 08 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,548 | $0 | Not Implemented |
DL0019 # 09 Y:2008 | 09 | 2008 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $1,248 | $760 | Not Implemented |
LL0296 # 01 Y:2008 | 01 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $463,124 | $9,955 | Not Implemented |
LL0296 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,005 | $24,680 | Implemented |
LL0296 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,199 | $40,662 | Not Implemented |
LL0296 # 04 Y:2008 | 04 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,169 | $2,120 | Implemented |
LL0296 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $4,739 | $3,400 | Not Implemented |
LL0296 # 06 Y:2008 | 06 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $3,670 | $3,894 | Not Implemented |
LL0296 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,916 | $1,750 | Implemented |
DL0017 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,841 | $0 | Not Implemented |
DL0017 # 02 Y:2008 | 02 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $738 | $0 | Not Implemented |
DL0017 # 03 Y:2008 | 03 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,007 | $800 | Implemented |
DL0017 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $6,100 | $12,100 | Not Implemented |
DL0017 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,006 | $26,496 | Implemented |
DL0017 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,572 | $165,000 | Not Implemented |
DL0018 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $425,000 | $120,000 | Implemented |
DL0018 # 02 Y:2008 | 02 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $207,000 | $250,000 | Implemented |
DL0018 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $188,000 | $108,000 | Implemented |
DL0018 # 04 Y:2008 | 04 | 2008 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $166,310 | $35,000 | Implemented |
DL0018 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $141,700 | $107,400 | Not Implemented |
DL0018 # 06 Y:2008 | 06 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $102,500 | $300,000 | Not Implemented |
DL0018 # 07 Y:2008 | 07 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $56,800 | $129,000 | Not Implemented |
DL0018 # 08 Y:2008 | 08 | 2008 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $44,400 | $35,000 | Not Implemented |
DL0018 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,200 | $16,000 | Not Implemented |
DL0018 # 10 Y:2008 | 10 | 2008 | USE SOLAR HEAT TO HEAT WATER | $26,000 | $175,000 | Not Implemented |