IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0973 # 03 Y:2024 03 2024 PAY UTILITY BILLS ON TIME $689 $200 Not Implemented
GT0973 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $1,850 Implemented
GT0973 # 02 Y:2024 02 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $394 $90 Implemented
GT0973 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $200 Implemented
GT0973 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,645 $800 Implemented
GT0971 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,705 $17,982 Not Implemented
GT0971 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,890 $1,850 Not Implemented
GT0971 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,632 $867 Not Implemented
GT0971 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $137,329 $2,565,299 Not Implemented
GT0971 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,384 $400 Not Implemented
GT0971 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,025 $5,227 Not Implemented
KS2321 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $646 $1,328 Implemented
KS2321 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29,979 $30 Not Implemented
KS2321 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $89,035 $701,322 Implemented
KS2321 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,362 $3,175 Not Implemented
KS2321 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,194 $18,538 Not Implemented
KS2321 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $5,241 $1,770 Not Implemented
KS2321 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,032 $5,480 Implemented
KS2321 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,249 $627,000 Implemented
KS2316 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,417 $0 Not Implemented
KS2316 # 10 Y:2023 10 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,892 $156,412 Implemented
KS2316 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $7,751 $6,350 Not Implemented
KS2316 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,228 $2,463 Not Implemented
KS2316 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,197 $1,784 Not Implemented
KS2316 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,198 $29,442 Not Implemented