Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,092
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0140 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $213 | $442 | Not Implemented |
IA0140 # 03 Y:1996 | 03 | 1996 | INSTALL OCCUPANCY SENSORS | $116 | $225 | Not Implemented |
IA0140 # 04 Y:1996 | 04 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $969 | $25 | Not Implemented |
IA0140 # 05 Y:1996 | 05 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $351 | $361 | Implemented |
IA0140 # 06 Y:1996 | 06 | 1996 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $127 | $680 | Not Implemented |
IA0140 # 07 Y:1996 | 07 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,056 | $4,500 | Not Implemented |
IA0140 # 08 Y:1996 | 08 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,734 | $20,000 | Not Implemented |
NV0063 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $200 | Implemented |
NV0063 # 02 Y:1996 | 02 | 1996 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $404 | $900 | Not Implemented |
NV0063 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,184 | $90 | Implemented |
NV0063 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $100 | $57 | Implemented |
NV0063 # 05 Y:1996 | 05 | 1996 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $228 | $180 | Not Implemented |
NV0063 # 06 Y:1996 | 06 | 1996 | INSULATE BARE EQUIPMENT | $2,375 | $1,452 | Implemented |
NV0063 # 07 Y:1996 | 07 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,535 | $5,200 | Implemented |
NV0063 # 08 Y:1996 | 08 | 1996 | USE OPTIMUM THICKNESS INSULATION | $9,970 | $2,000 | Implemented |
NV0063 # 09 Y:1996 | 09 | 1996 | USE OPTIMUM THICKNESS INSULATION | $4,848 | $6,210 | Implemented |
NV0063 # 10 Y:1996 | 10 | 1996 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $360 | $600 | Not Implemented |
NV0063 # 11 Y:1996 | 11 | 1996 | MODIFY MATERIAL APPLICATION METHODS | $28,063 | $2,040 | Implemented |
GT0590 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,170 | $116,000 | Not Implemented |
GT0590 # 02 Y:1996 | 02 | 1996 | REPAIR AND ELIMINATE STEAM LEAKS | $30,732 | $2,000 | Implemented |
GT0590 # 03 Y:1996 | 03 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,040 | $8,800 | Not Implemented |
GT0590 # 04 Y:1996 | 04 | 1996 | ADJUST BURNERS FOR EFFICIENT OPERATION | $40,100 | $30,000 | Implemented |
GT0590 # 05 Y:1996 | 05 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,880 | $60,000 | Not Implemented |
GT0590 # 06 Y:1996 | 06 | 1996 | REDUCE EXCESSIVE BOILER BLOWDOWN | $18,987 | $400 | Implemented |
GT0590 # 07 Y:1996 | 07 | 1996 | USE PHOTOCELL CONTROLS | $680 | $218 | Not Implemented |