IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0071 # 11 Y:1993 11 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $310 $520 Not Implemented
IA0071 # 12 Y:1993 12 1993 RECOVER WASTE HEAT FROM EQUIPMENT $8,254 $9,000 Not Implemented
MO0099 # 01 Y:1993 01 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,072 $11,325 Not Implemented
MO0099 # 02 Y:1993 02 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $760 $150 Implemented
MO0099 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $684 $578 Implemented
MO0099 # 04 Y:1993 04 1993 USE OPTIMUM THICKNESS INSULATION $597 $1,629 Not Implemented
MO0099 # 05 Y:1993 05 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $333 $200 Not Implemented
MO0099 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,419 $10,452 Implemented
MO0099 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $466 Implemented
MO0099 # 08 Y:1993 08 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $490 $1,207 Implemented
MO0099 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $162 $150 Implemented
AS0097 # 01 Y:1993 01 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,381 $9,500 Not Implemented
AS0097 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,546 $2,000 Not Implemented
AS0097 # 03 Y:1993 03 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,898 $235,000 Not Implemented
AS0097 # 04 Y:1993 04 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $61,773 $50,500 Implemented
AS0097 # 05 Y:1993 05 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,095 $35,400 Not Implemented
AS0097 # 06 Y:1993 06 1993 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,277 $88,239 Not Implemented
AS0097 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $800 Implemented
AS0097 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,582 $0 Not Implemented
AS0097 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $180 Implemented
AS0097 # 10 Y:1993 10 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,151 $5,265 Not Implemented
NC0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $2,928 Not Implemented
NC0011 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $21,960 Not Implemented
NC0011 # 03 Y:1993 03 1993 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $7,188 $1,760 Implemented
NC0011 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $1,200 Implemented