Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,902
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0284 # 08 Y:1989 | 08 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $169 | $0 | Implemented |
KU0273 # 01 Y:1989 | 01 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $25,620 | $38,400 | Implemented |
KU0273 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,343 | $1,400 | Implemented |
KU0273 # 03 Y:1989 | 03 | 1989 | INSTALL TURBULATORS | $5,599 | $5,760 | Implemented |
KU0273 # 04 Y:1989 | 04 | 1989 | KEEP BOILER TUBES CLEAN | $3,005 | $1,500 | Implemented |
KU0273 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,859 | $2,558 | Implemented |
AM0055 # 01 Y:1989 | 01 | 1989 | IMPROVE LUBRICATION PRACTICES | $1,260 | $0 | Not Implemented |
AM0055 # 02 Y:1989 | 02 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $917 | $0 | Not Implemented |
AM0055 # 03 Y:1989 | 03 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $547 | $500 | Implemented |
AM0055 # 04 Y:1989 | 04 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $590 | $1,000 | Implemented |
AM0055 # 05 Y:1989 | 05 | 1989 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $130 | $220 | Implemented |
GT0359 # 01 Y:1988 | 01 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,132 | $1,995 | Implemented |
GT0359 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $18,570 | $0 | Implemented |
GT0359 # 03 Y:1988 | 03 | 1988 | AIR CONDITION ONLY SPACE NECESSARY | $830 | $320 | Not Implemented |
GT0359 # 04 Y:1988 | 04 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $700 | $500 | Implemented |
RU0043 # 01 Y:1988 | 01 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,773 | $0 | Implemented |
RU0043 # 02 Y:1988 | 02 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,546 | $7,020 | Not Implemented |
RU0043 # 03 Y:1988 | 03 | 1988 | IMPROVE LUBRICATION PRACTICES | $298 | $800 | Implemented |
RU0043 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,890 | $678 | Implemented |
RU0043 # 05 Y:1988 | 05 | 1988 | TURN OFF STEAM TRACING DURING MILD WEATHER | $9,235 | $0 | Implemented |
RU0043 # 06 Y:1988 | 06 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $4,858 | $1,195 | Implemented |
RU0043 # 07 Y:1988 | 07 | 1988 | INSULATE BARE EQUIPMENT | $2,812 | $384 | Implemented |
RU0043 # 08 Y:1988 | 08 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $998 | $500 | Implemented |
RU0045 # 01 Y:1988 | 01 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,025 | $0 | Implemented |
RU0045 # 02 Y:1988 | 02 | 1988 | IMPROVE LUBRICATION PRACTICES | $356 | $800 | Not Implemented |