IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,507

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0223 # 03 Y:1984 03 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $5,685 $8,880 Not Implemented
TN0223 # 04 Y:1984 04 1984 USE MINIMUM STEAM OPERATING PRESSURE $908 $0 Not Implemented
TN0223 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $0 Implemented
TN0223 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,336 $0 Not Implemented
TN0223 # 07 Y:1984 07 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $966 $0 Not Implemented
TN0223 # 08 Y:1984 08 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $305 $133 Implemented
TN0210 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,637 $100 Implemented
TN0210 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,764 $2,000 Implemented
TN0210 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $879 $2,780 Not Implemented
TN0210 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $189 $70 Implemented
TN0210 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $20 Implemented
KU0117 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,895 $15,000 Not Implemented
KU0117 # 02 Y:1984 02 1984 INSTALL TURBULATORS $4,977 $2,620 Not Implemented
KU0117 # 03 Y:1984 03 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,455 $300 Not Implemented
KU0117 # 04 Y:1984 04 1984 REPAIR OR REPLACE STEAM TRAPS $18,415 $4,200 Implemented
KU0117 # 05 Y:1984 05 1984 OPTIMIZE PLANT POWER FACTOR $6,702 $9,600 Not Implemented
KU0117 # 06 Y:1984 06 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,430 $2,900 Not Implemented
KU0117 # 07 Y:1984 07 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $336 $500 Not Implemented
KU0117 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,541 $4,029 Implemented
KU0117 # 09 Y:1984 09 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $4,088 $1,026 Not Implemented
KU0117 # 10 Y:1984 10 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,170 $3,772 Implemented
UD0112 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,036 $800 Implemented
UD0112 # 02 Y:1984 02 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $18,921 $21,000 Implemented
UD0112 # 03 Y:1984 03 1984 REDESIGN PROCESS $4,152 $1,200 Not Implemented
UD0112 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,427 $8,505 Implemented