IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,496

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0020 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,824 $30,000 Implemented
UD0020 # 02 Y:1982 02 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $430 $300 Implemented
UD0020 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $138 $350 Not Implemented
UD0022 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $45 Implemented
UD0022 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $2,497 $700 Not Implemented
UD0022 # 03 Y:1982 03 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $39,185 $33,000 Implemented
TN0106 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,816 $6,885 Not Implemented
TN0107 # 01 Y:1982 01 1982 REDUCE VENTILATION AIR $10,642 $350 Not Implemented
TN0107 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,533 $2,195 Not Implemented
TN0106 # 01 Y:1982 01 1982 INSTALL STORM WINDOWS AND DOORS $2,553 $11,186 Not Implemented
TN0106 # 02 Y:1982 02 1982 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $926 $3,450 Not Implemented
TN0106 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $574 $200 Not Implemented
KU0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $3,935 Implemented
KU0033 # 02 Y:1982 02 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,573 $0 Implemented
KU0033 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $700 Implemented
KU0033 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $69 $0 Implemented
UD0016 # 01 Y:1981 01 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $123 $300 Implemented
UD0016 # 02 Y:1981 02 1981 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,251 $752 Implemented
UD0016 # 03 Y:1981 03 1981 USE OPTIMUM THICKNESS INSULATION $245 $0 Implemented
UD0016 # 04 Y:1981 04 1981 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $2,698 $760 Implemented
UD0016 # 05 Y:1981 05 1981 INSTALL STORM WINDOWS AND DOORS $1,452 $1,208 Implemented