IAC Assessment: WI0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1989
Principal Product DISTILLED BOTTLED WATER
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $1,000,000-$5,000,000
# of Employees 105
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,388 2,128,664 kWh $0.06
Natural Gas $74,912 15,858 MMBtu $4.72
TOTAL ENERGY COSTS $207,300
RECOMMENDED SAVINGS* $92,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,902
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$51,883
Cost:
$300,000
$79,306 1,274,912 $(-27,423) (-5,810) $79,306
1,274,912
kWh
$(-27,423)
(-5,810)
MMBtu
02: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$11,109
Cost:
$6,000
- - $11,109 2,354 -
-
kWh
$11,109
2,354
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,165
Cost:
$15,000
- - $9,165 1,942 -
-
kWh
$9,165
1,942
MMBtu
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$6,568
Cost:
$8,000
- - $6,568 1,392 -
-
kWh
$6,568
1,392
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,346
Cost:
$750
- - $5,346 1,133 -
-
kWh
$5,346
1,133
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,916
Cost:
-
$2,916 - - - $2,916
-
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,143
Cost:
$1,243
$1,143 18,464 - - $1,143
18,464
kWh
-
-
MMBtu
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,989
Cost:
-
$1,989 31,946 - - $1,989
31,946
kWh
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$691
Cost:
-
$691 11,137 - - $691
11,137
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$523
Cost:
$750
$523 8,499 - - $523
8,499
kWh
-
-
MMBtu
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$500
Cost:
$800
- - $500 106 -
-
kWh
$500
106
MMBtu
12: 2.6232 INSTALL SET-BACK TIMERS Savings:
$317
Cost:
$400
$317 4,982 - - $317
4,982
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$92,150
Cost:
$332,943
$86,885 1,349,940 $5,265 1,117 $86,885
1,349,940
kWh
$5,265
1,117
MMBtu
TOTAL IMPLEMENTED Savings:
$12,902
Cost:
$3,193
$7,056 66,529 $5,846 1,239 $7,056
66,529
kWh
$5,846
1,239
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas