Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
123
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0570 # 04 Y:2005 | 04 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,182 | $20,800 | Not Implemented |
MA0570 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,127 | $30,357 | Implemented |
MA0570 # 06 Y:2005 | 06 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,432 | $32,499 | Not Implemented |
MA0570 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,365 | $0 | Implemented |
MA0570 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,708 | $7,000 | Implemented |
MA0570 # 09 Y:2005 | 09 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,891 | $200 | Not Implemented |
MA0570 # 10 Y:2005 | 10 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $960 | $600 | Implemented |
MA0481 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $30,000 | Implemented |
MA0481 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,390 | $5,500 | Implemented |
MA0481 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,380 | $4,800 | Not Implemented |
MA0481 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,370 | $7,000 | Implemented |
MA0481 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,315 | Implemented |
MA0481 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,400 | $10,000 | Not Implemented |
MA0481 # 07 Y:2001 | 07 | 2001 | INSULATE FEEDWATER TANK | $375 | $1,000 | Implemented |
MA0481 # 08 Y:2001 | 08 | 2001 | INSULATE FEEDWATER TANK | $260 | $1,300 | Not Implemented |
MA0477 # 01 Y:2000 | 01 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $22,890 | $2,000 | Not Implemented |
MA0477 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,290 | $103,000 | Not Implemented |
MA0477 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,580 | $21,000 | Not Implemented |
MA0477 # 04 Y:2000 | 04 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,910 | $0 | Not Implemented |
MA0477 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,200 | $11,700 | Implemented |
MA0477 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $410 | $500 | Implemented |
MA0266 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,208 | $1,950 | Implemented |
MA0266 # 02 Y:1993 | 02 | 1993 | USE RADIANT HEATER FOR SPOT HEATING | $922 | $0 | Not Implemented |
MA0266 # 03 Y:1993 | 03 | 1993 | INSTALL OCCUPANCY SENSORS | $695 | $419 | Implemented |
MA0266 # 04 Y:1993 | 04 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $470 | $400 | Implemented |