IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0182 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $950 $311 Not Implemented
IC0182 # 09 Y:2011 09 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,442 $311 Not Implemented
IC0182 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $5,217 $50,324 Not Implemented
IC0182 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,294 $921 Not Implemented
IC0182 # 12 Y:2011 12 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,314 $1,318 Not Implemented
IC0182 # 13 Y:2011 13 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $379 $379 Not Implemented
IC0182 # 14 Y:2011 14 2011 OPTIMIZE PLANT POWER FACTOR $3,378 $20,932 Not Implemented
IC0182 # 15 Y:2011 15 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $0 Not Implemented
IC0153 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $1,078 $642 Not Implemented
IC0153 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
IC0153 # 03 Y:2009 03 2009 USE SOLAR HEAT TO HEAT WATER $605 $2,240 Not Implemented
WI0513 # 01 Y:2006 01 2006 $42,840 $1,800 Implemented
WI0513 # 02 Y:2006 02 2006 $16,286 $2,450 Not Implemented
WI0513 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,175 $1,000 Not Implemented
WI0513 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,710 $5,940 Implemented
WI0513 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,821 $640 Not Implemented
WI0513 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,987 $450 Not Implemented
WI0513 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $0 Implemented
WI0513 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,291 $400 Implemented
WI0513 # 09 Y:2006 09 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,277 $200 Implemented
WI0472 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,956 $16,640 n/a
WI0472 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,258 $9,780 n/a
WI0472 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,700 $5,500 n/a
WI0472 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $596 $640 n/a
WI0472 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,375 $1,145 n/a