IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

424

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0322 # 08 Y:2025 08 2025 INSTALL TIMERS AND/OR THERMOSTATS $4,457 $211 n/a
IC0322 # 02 Y:2025 02 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,455 $41,668 n/a
IC0322 # 10 Y:2025 10 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,536 $2,000 n/a
IC0322 # 03 Y:2025 03 2025 INCREASE AMOUNT OF CONDENSATE RETURNED $36,404 $43,673 n/a
IC0322 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,658 $693 n/a
IC0322 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,041 $210 n/a
IC0322 # 01 Y:2025 01 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $102,930 $45,500 n/a
IC0322 # 11 Y:2025 11 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $205 $144 n/a
IC0322 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,000 $1,250 n/a
IC0322 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,262 $24,421 n/a
IC0322 # 09 Y:2025 09 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,919 $0 n/a
IC0313 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $4,631 $8,869 n/a
IC0313 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,557 $0 n/a
IC0313 # 08 Y:2024 08 2024 ADOPT IN-HOUSE MATERIAL GENERATION $75,451 $92,231 n/a
IC0313 # 09 Y:2024 09 2024 REPAIR AND ELIMINATE STEAM LEAKS $19,590 $704 n/a
IC0313 # 07 Y:2024 07 2024 RECOVER WASTE HEAT FROM EQUIPMENT $10,223 $100,000 n/a
IC0313 # 10 Y:2024 10 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,979 $2,430 n/a
IC0313 # 01 Y:2024 01 2024 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $9,651 $7,079 n/a
IC0313 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $6,524 $27,807 n/a
IC0313 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,562 $0 n/a
IC0313 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,211 $220,985 n/a
IC0313 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,107 $6,125 n/a
IC0229 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,701 $2,326 Implemented
IC0229 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $1,024 $1,131 Implemented
IC0229 # 04 Y:2019 04 2019 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $2,133 $2,010 Implemented