Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
220
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0323 # 02 Y:2009 | 02 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,990 | $990 | Not Implemented |
LL0323 # 03 Y:2009 | 03 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,498 | $990 | Not Implemented |
LL0323 # 05 Y:2009 | 05 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $315 | $190 | Not Implemented |
LL0323 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,211 | $8,680 | Implemented |
LL0323 # 04 Y:2009 | 04 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $682 | $623 | Not Implemented |
WV0397 # 10 Y:2009 | 10 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $7,120 | $5,500 | Implemented |
WV0397 # 08 Y:2009 | 08 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,726 | $1,000 | Implemented |
WV0397 # 11 Y:2009 | 11 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,792 | $19,960 | Implemented |
WV0397 # 09 Y:2009 | 09 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,377 | $49,300 | Not Implemented |
WV0397 # 04 Y:2009 | 04 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $56,916 | $80,000 | Not Implemented |
WV0397 # 05 Y:2009 | 05 | 2009 | OPTIMIZE PLANT POWER FACTOR | $40,984 | $44,000 | Not Implemented |
WV0397 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $26,130 | $36,900 | Not Implemented |
WV0397 # 03 Y:2009 | 03 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $77,885 | $17,000 | Not Implemented |
WV0397 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $153,645 | $145,000 | Not Implemented |
WV0397 # 02 Y:2009 | 02 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $81,057 | $131,239 | Not Implemented |
WV0397 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,728 | $0 | Implemented |
UM0359 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $1,161 | $30,000 | Implemented |
UM0359 # 03 Y:2009 | 03 | 2009 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $13,963 | $400 | Implemented |
UM0359 # 05 Y:2009 | 05 | 2009 | INSTALL STORM WINDOWS AND DOORS | $6,298 | $24,510 | Implemented |
UM0359 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,026 | $50,000 | Implemented |
UM0359 # 10 Y:2009 | 10 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $472 | $10,000 | Implemented |
UM0359 # 04 Y:2009 | 04 | 2009 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,980 | $9,000 | Not Implemented |
UM0359 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,630 | $5,000 | Not Implemented |
UM0359 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $20,146 | $500 | Implemented |
UM0359 # 06 Y:2009 | 06 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,724 | $7,574 | Not Implemented |