Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0101 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,915 | $12,372 | Not Implemented |
TT0101 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,315 | $3,000 | Implemented |
TT0101 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $617 | $2,994 | Not Implemented |
TT0101 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,803 | $15,990 | Not Implemented |
TT0101 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $114 | $764 | Not Implemented |
TT0101 # 01 Y:2012 | 01 | 2012 | USE CORRECT SIZE STEAM TRAPS | $33,071 | $12,000 | Implemented |
TT0101 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,046 | $13,216 | Not Implemented |
TT0101 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $714 | Not Implemented |
TT0101 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,527 | $45,923 | Not Implemented |
TT0101 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $8,082 | $6,528 | Not Implemented |
TT0101 # 11 Y:2012 | 11 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $6,395 | $100,000 | Not Implemented |
DL0098 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,060 | $4,880 | Implemented |
DL0098 # 04 Y:2012 | 04 | 2012 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $10,500 | $19,500 | Implemented |
DL0098 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,100 | $18,000 | Implemented |
DL0098 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,900 | $18,000 | Implemented |
DL0098 # 01 Y:2012 | 01 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $92,987 | $22,000 | Implemented |
DL0098 # 06 Y:2012 | 06 | 2012 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $700 | $500 | Not Implemented |
MZ0105 # 04 Y:2012 | 04 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $8,215 | $52,200 | Implemented |
MZ0105 # 06 Y:2012 | 06 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $42,514 | $318,000 | Not Implemented |
MZ0105 # 09 Y:2012 | 09 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,288 | $2,000 | Implemented |
MZ0105 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,462 | $115,696 | Not Implemented |
MZ0105 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $920 | $1,160 | Not Implemented |
MZ0105 # 03 Y:2012 | 03 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,339 | $13,500 | Not Implemented |
MZ0105 # 02 Y:2012 | 02 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $42,257 | $4,645 | Implemented |
MZ0105 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $28,300 | Implemented |