Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,116
matching recommendationsSIC | 281 | Industrial Inorganic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |
UU0258 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,690,000 | $23,500,000 | n/a |
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
UU0258 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,570 | $5,140 | n/a |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | n/a |
UU0258 # 08 Y:2024 | 08 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $180,000 | $20,000 | n/a |
UU0258 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $120,000 | $198,000 | n/a |
WV0669 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,467 | $940 | Implemented |
WV0669 # 13 Y:2024 | 13 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,227 | $5,535 | Implemented |
WV0669 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,884 | $35,717 | Not Implemented |
WV0669 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,886 | $1,088 | Implemented |
WV0669 # 15 Y:2024 | 15 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $397 | $1,920 | Not Implemented |
WV0669 # 10 Y:2024 | 10 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,422 | $7,600 | Not Implemented |
WV0669 # 14 Y:2024 | 14 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $843 | $1,200 | Implemented |
WV0669 # 17 Y:2024 | 17 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $135 | $363 | Implemented |
WV0669 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,542 | $14,640 | Not Implemented |
WV0669 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,194 | $16,795 | Not Implemented |
WV0669 # 16 Y:2024 | 16 | 2024 | INSULATE BARE EQUIPMENT | $357 | $798 | Implemented |
WV0669 # 12 Y:2024 | 12 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,463 | $1,143 | Implemented |
WV0669 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,909 | $6,900 | Not Implemented |
WV0669 # 06 Y:2024 | 06 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,200 | $11,000 | Not Implemented |
WV0669 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $19,270 | $9,950 | Implemented |
WV0669 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,442 | $5,225 | Implemented |
WV0669 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,954 | $10,900 | Not Implemented |
UC2407 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,157 | $100 | n/a |