Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 281 | Industrial Inorganic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0258 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,800 | $6,200 | n/a |
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |
UU0258 # 08 Y:2024 | 08 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $180,000 | $20,000 | n/a |
UU0258 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $120,000 | $198,000 | n/a |
UU0258 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,570 | $5,140 | n/a |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | n/a |
UU0258 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,690,000 | $23,500,000 | n/a |
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
WV0669 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,542 | $14,640 | Not Implemented |
WV0669 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,909 | $6,900 | Not Implemented |
WV0669 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,442 | $5,225 | Implemented |
WV0669 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,884 | $35,717 | Not Implemented |
WV0669 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $19,270 | $9,950 | Implemented |
WV0669 # 14 Y:2024 | 14 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $843 | $1,200 | Implemented |
WV0669 # 15 Y:2024 | 15 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $397 | $1,920 | Not Implemented |
WV0669 # 10 Y:2024 | 10 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,422 | $7,600 | Not Implemented |
WV0669 # 12 Y:2024 | 12 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,463 | $1,143 | Implemented |
WV0669 # 13 Y:2024 | 13 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,227 | $5,535 | Implemented |
WV0669 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,467 | $940 | Implemented |
WV0669 # 17 Y:2024 | 17 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $135 | $363 | Implemented |
WV0669 # 16 Y:2024 | 16 | 2024 | INSULATE BARE EQUIPMENT | $357 | $798 | Implemented |
WV0669 # 06 Y:2024 | 06 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,200 | $11,000 | Not Implemented |
WV0669 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,954 | $10,900 | Not Implemented |
WV0669 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,194 | $16,795 | Not Implemented |
WV0669 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,886 | $1,088 | Implemented |