Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 2812 | Alkalies And Chlorine |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | n/a |
UU0258 # 08 Y:2024 | 08 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $180,000 | $20,000 | n/a |
UU0258 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $120,000 | $198,000 | n/a |
UU0258 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,690,000 | $23,500,000 | n/a |
UU0258 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,800 | $6,200 | n/a |
UU0258 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,570 | $5,140 | n/a |
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |
WV0599 # 13 Y:2020 | 13 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,644 | $1,250 | Implemented |
WV0599 # 14 Y:2020 | 14 | 2020 | INSULATE BARE EQUIPMENT | $361 | $1,123 | Implemented |
WV0599 # 05 Y:2020 | 05 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,981 | $2,000 | Implemented |
WV0599 # 08 Y:2020 | 08 | 2020 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $10,828 | $39,480 | Not Implemented |
WV0599 # 06 Y:2020 | 06 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $13,389 | $2,433 | Not Implemented |
WV0599 # 07 Y:2020 | 07 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,054 | $14,700 | Implemented |
WV0599 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,793 | $83,200 | Implemented |
WV0599 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,379 | $45,860 | Implemented |
WV0599 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,634 | $94,500 | Implemented |
WV0599 # 01 Y:2020 | 01 | 2020 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $126,151 | $250,000 | Not Implemented |
WV0599 # 11 Y:2020 | 11 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $4,587 | $27,500 | Not Implemented |
WV0599 # 12 Y:2020 | 12 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,517 | $2,256 | Implemented |
WV0599 # 09 Y:2020 | 09 | 2020 | IMPROVE COMBUSTION CONTROL CAPABILITY | $9,278 | $8,650 | Not Implemented |
WV0599 # 10 Y:2020 | 10 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,356 | $21,400 | Implemented |
SU0449 # 02 Y:2017 | 02 | 2017 | ELIMINATE/REDUCE AN OPERATION | $1,271 | $900 | Not Implemented |
SU0449 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $194 | $208 | Not Implemented |
SU0449 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,895 | $3,697 | Implemented |