IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
SIC 2812 Alkalies And Chlorine
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0599 # 10 Y:2020 10 2020 RECOVER WASTE HEAT FROM EQUIPMENT $7,356 $21,400 Implemented
WV0599 # 14 Y:2020 14 2020 INSULATE BARE EQUIPMENT $361 $1,123 Implemented
WV0599 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,054 $14,700 Implemented
WV0599 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,379 $45,860 Implemented
WV0599 # 01 Y:2020 01 2020 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $126,151 $250,000 Not Implemented
WV0599 # 13 Y:2020 13 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $1,250 Implemented
WV0599 # 12 Y:2020 12 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,517 $2,256 Implemented
WV0599 # 06 Y:2020 06 2020 DEVELOP A REPAIR/REPLACE POLICY $13,389 $2,433 Not Implemented
WV0599 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,634 $94,500 Implemented
WV0599 # 09 Y:2020 09 2020 IMPROVE COMBUSTION CONTROL CAPABILITY $9,278 $8,650 Not Implemented
WV0599 # 08 Y:2020 08 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,828 $39,480 Not Implemented
WV0599 # 11 Y:2020 11 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,587 $27,500 Not Implemented
WV0599 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,981 $2,000 Implemented
WV0599 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $25,793 $83,200 Implemented
SU0449 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,182 $15,784 Not Implemented
SU0449 # 02 Y:2017 02 2017 ELIMINATE/REDUCE AN OPERATION $1,271 $900 Not Implemented
SU0449 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,375 $267 Not Implemented
SU0449 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $194 $208 Not Implemented
SU0449 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,895 $3,697 Implemented
UM0471 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $696 $2,500 n/a
UM0471 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,290 $500 n/a
UM0471 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,500 n/a
UM0471 # 05 Y:2016 05 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,664 $3,435 n/a
UM0471 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,462 $1,750 n/a
UA3017 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $201,277 $312,000 Not Implemented