Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2020 |
Principal Product | Chlorinated Dry Bleach |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2812 - Alkalies And Chlorine |
Sales | $50,000,000-$100,000,000 |
# of Employees | 232 |
Plant Area (Sq.Ft.) | 865,000 |
Annual Production | 51,700,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,282,009 | 38,688,000 | kWh | $0.03 |
Electricity Demand | $940,893 | 62,717 | kW-months/year | $15.00 |
Electricity Fees | $114,518 | - | $ | - |
Natural Gas | $611,704 | 206,312 | MMBtu | $2.96 |
TOTAL ENERGY COSTS | $3,130,169 | |||
RECOMMENDED SAVINGS* | $299,952 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $135,719 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) |
Savings: $126,151 Cost: $250,000 |
$(-16,552) | (-500,059) | - | - | $25,524 | 8,623 | $117,179 | 15,238 | - | - |
$(-16,552) (-500,059) kWh |
- - kW-months/year |
$25,524 8,623 MMBtu |
$117,179 15,238 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $50,634 Cost: $94,500 |
$30,249 | 913,871 | $20,385 | 1,359 | - | - | - | - | - | - |
$30,249 913,871 kWh |
$20,385 1,359 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $25,793 Cost: $83,200 |
$20,378 | 615,656 | $5,415 | 361 | - | - | - | - | - | - |
$20,378 615,656 kWh |
$5,415 361 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $18,379 Cost: $45,860 |
- | - | - | - | $18,379 | 6,209 | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,379 6,209 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $15,981 Cost: $2,000 |
- | - | - | - | $16,461 | 5,561 | - | - | $(-480) | - |
- - kWh |
- - kW-months/year |
$16,461 5,561 MMBtu |
- - Tgal |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $13,389 Cost: $2,433 |
$8,224 | 248,473 | $5,325 | 355 | - | - | - | - | $(-160) | - |
$8,224 248,473 kWh |
$5,325 355 kW-months/year |
- - MMBtu |
- - Tgal |
$(-160) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,054 Cost: $14,700 |
$7,314 | 220,975 | $4,740 | 316 | - | - | - | - | - | - |
$7,314 220,975 kWh |
$4,740 316 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $10,828 Cost: $39,480 |
- | - | - | - | $10,828 | 3,658 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,828 3,658 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $9,278 Cost: $8,650 |
- | - | - | - | $9,398 | 3,175 | - | - | $(-120) | - |
- - kWh |
- - kW-months/year |
$9,398 3,175 MMBtu |
- - Tgal |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,356 Cost: $21,400 |
- | - | - | - | $7,356 | 2,485 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,356 2,485 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $4,587 Cost: $27,500 |
$2,787 | 84,209 | $1,800 | 120 | - | - | - | - | - | - |
$2,787 84,209 kWh |
$1,800 120 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,517 Cost: $2,256 |
$2,137 | 64,565 | $1,380 | 92 | - | - | - | - | - | - |
$2,137 64,565 kWh |
$1,380 92 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,644 Cost: $1,250 |
$999 | 30,182 | $645 | 43 | - | - | - | - | - | - |
$999 30,182 kWh |
$645 43 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $361 Cost: $1,123 |
- | - | - | - | $361 | 122 | - | - | - | - |
- - kWh |
- - kW-months/year |
$361 122 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $299,952 Cost: $594,352 |
$55,536 | 1,677,872 | $39,690 | 2,646 | $88,307 | 29,833 | $117,179 | 15,238 | $(-760) | - | $55,536 1,677,872 kWh |
$39,690 2,646 kW-months/year |
$88,307 29,833 MMBtu |
$117,179 15,238 Tgal |
$(-760) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $135,719 Cost: $266,289 |
$61,077 | 1,845,249 | $32,565 | 2,171 | $42,557 | 14,377 | - | - | $(-480) | - | $61,077 1,845,249 kWh |
$32,565 2,171 kW-months/year |
$42,557 14,377 MMBtu |
- - Tgal |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes |