IAC Assessment: WV0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2020
Principal Product Chlorinated Dry Bleach
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2812 - Alkalies And Chlorine
Sales $50,000,000-$100,000,000
# of Employees 232
Plant Area (Sq.Ft.) 865,000
Annual Production 51,700,000 Pounds
Production Hrs. Annual 8,400
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,282,009 38,688,000 kWh $0.03
Electricity Demand $940,893 62,717 kW-months/year $15.00
Electricity Fees $114,518 - $ -
Natural Gas $611,704 206,312 MMBtu $2.96
TOTAL ENERGY COSTS $3,130,169
RECOMMENDED SAVINGS* $299,952 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $135,719
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$126,151
Cost:
$250,000
$(-16,552) (-500,059) - - $25,524 8,623 $117,179 15,238 - - $(-16,552)
(-500,059)
kWh
-
-
kW-months/year
$25,524
8,623
MMBtu
$117,179
15,238
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$50,634
Cost:
$94,500
$30,249 913,871 $20,385 1,359 - - - - - - $30,249
913,871
kWh
$20,385
1,359
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$25,793
Cost:
$83,200
$20,378 615,656 $5,415 361 - - - - - - $20,378
615,656
kWh
$5,415
361
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,379
Cost:
$45,860
- - - - $18,379 6,209 - - - - -
-
kWh
-
-
kW-months/year
$18,379
6,209
MMBtu
-
-
Tgal
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,981
Cost:
$2,000
- - - - $16,461 5,561 - - $(-480) - -
-
kWh
-
-
kW-months/year
$16,461
5,561
MMBtu
-
-
Tgal
$(-480)
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$13,389
Cost:
$2,433
$8,224 248,473 $5,325 355 - - - - $(-160) - $8,224
248,473
kWh
$5,325
355
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-160)
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,054
Cost:
$14,700
$7,314 220,975 $4,740 316 - - - - - - $7,314
220,975
kWh
$4,740
316
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$10,828
Cost:
$39,480
- - - - $10,828 3,658 - - - - -
-
kWh
-
-
kW-months/year
$10,828
3,658
MMBtu
-
-
Tgal
-
-
$
09: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$9,278
Cost:
$8,650
- - - - $9,398 3,175 - - $(-120) - -
-
kWh
-
-
kW-months/year
$9,398
3,175
MMBtu
-
-
Tgal
$(-120)
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,356
Cost:
$21,400
- - - - $7,356 2,485 - - - - -
-
kWh
-
-
kW-months/year
$7,356
2,485
MMBtu
-
-
Tgal
-
-
$
11: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$4,587
Cost:
$27,500
$2,787 84,209 $1,800 120 - - - - - - $2,787
84,209
kWh
$1,800
120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,517
Cost:
$2,256
$2,137 64,565 $1,380 92 - - - - - - $2,137
64,565
kWh
$1,380
92
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,644
Cost:
$1,250
$999 30,182 $645 43 - - - - - - $999
30,182
kWh
$645
43
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
14: 2.2511 INSULATE BARE EQUIPMENT Savings:
$361
Cost:
$1,123
- - - - $361 122 - - - - -
-
kWh
-
-
kW-months/year
$361
122
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$299,952
Cost:
$594,352
$55,536 1,677,872 $39,690 2,646 $88,307 29,833 $117,179 15,238 $(-760) - $55,536
1,677,872
kWh
$39,690
2,646
kW-months/year
$88,307
29,833
MMBtu
$117,179
15,238
Tgal
$(-760)
-
$
TOTAL IMPLEMENTED Savings:
$135,719
Cost:
$266,289
$61,077 1,845,249 $32,565 2,171 $42,557 14,377 - - $(-480) - $61,077
1,845,249
kWh
$32,565
2,171
kW-months/year
$42,557
14,377
MMBtu
-
-
Tgal
$(-480)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes