IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 2813 Industrial Gases
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0288 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $390 $1,390 Implemented
OR0288 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,100 $9,050 Not Implemented
MO0191 # 01 Y:1996 01 1996 $47,917 $136,000 Implemented
MO0191 # 02 Y:1996 02 1996 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $3,620 $625 Not Implemented
MO0191 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,247 $80 Implemented
MO0191 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,490 $250 Implemented
MO0191 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $5,576 Implemented
MO0191 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $1,410 Implemented
MO0191 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $0 Implemented
CO0236 # 01 Y:1992 01 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $820 $100 Implemented
CO0236 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $225 Implemented
CO0236 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,860 $1,600 Implemented
CO0236 # 04 Y:1992 04 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,650 $2,000 Implemented
CO0236 # 05 Y:1992 05 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,900 $1,600 Implemented
CO0236 # 06 Y:1992 06 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $730 $1,200 Implemented
CO0236 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $550 $1,290 Implemented
AM0055 # 01 Y:1989 01 1989 IMPROVE LUBRICATION PRACTICES $1,260 $0 Not Implemented
AM0055 # 02 Y:1989 02 1989 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $917 $0 Not Implemented
AM0055 # 03 Y:1989 03 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $547 $500 Implemented
AM0055 # 04 Y:1989 04 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $590 $1,000 Implemented
AM0055 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $130 $220 Implemented
ST0071 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,364 $537 Implemented
ST0071 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $9,159 $1,000 Implemented
ST0071 # 03 Y:1986 03 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $108 $0 Implemented
ST0071 # 04 Y:1986 04 1986 REPAIR AND ELIMINATE STEAM LEAKS $5,948 $500 Implemented