IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
SIC 2813 Industrial Gases
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0230 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,758 $900 Not Implemented
LE0230 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,528 $0 Not Implemented
LE0230 # 03 Y:2006 03 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $9,817 $0 Not Implemented
LE0230 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,950 $2,250 Not Implemented
LE0230 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,350 $2,400 Not Implemented
LE0230 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $959 $200 Not Implemented
LE0230 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $2,282 $1,500 Not Implemented
LE0230 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,262 $13,497 Not Implemented
SF0253 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,274 $9,590 Not Implemented
SF0253 # 04 Y:2003 04 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,627 $50,000 Not Implemented
SF0253 # 01 Y:2003 01 2003 USE PHOTOCELL CONTROLS $715 $120 Not Implemented
SF0253 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,369 $9,627 Not Implemented
SF0253 # 02 Y:2003 02 2003 USE MULTIPLE-EFFECT EVAPORATORS $88,799 $75,000 Not Implemented
WV0186 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $100 $138 Implemented
WV0186 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $730 $472 Implemented
WV0186 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $5,510 $0 Implemented
WV0186 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $200 $470 Not Implemented
WV0186 # 10 Y:2000 10 2000 RECOVER AND REUSE WASTE MATERIAL $5,755 $5,000 Not Implemented
WV0186 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,834 $1,000 Not Implemented
WV0186 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $47,250 $400,000 Not Implemented
WV0186 # 11 Y:2000 11 2000 PAY BILLS ON TIME TO AVOID LATE FEES $371 $0 Implemented
WV0186 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $385 $45 Implemented
WV0186 # 09 Y:2000 09 2000 METER WASTE WATER $25,656 $0 Implemented
WV0186 # 04 Y:2000 04 2000 ISOLATE HOT OR COLD EQUIPMENT $655 $1,580 Not Implemented
OR0340 # 03 Y:1999 03 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,110 $5,160 Not Implemented