IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
SIC 2816 Inorganic Pigments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0447 # 04 Y:2017 04 2017 SELL COMBUSTIBLE WASTE $32,800 $9 Not Implemented
WV0447 # 11 Y:2012 11 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,103 $3,155 Not Implemented
WV0447 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,067 $17,569 Implemented
WV0447 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $7,871 $1,608 Implemented
WV0447 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $19,009 $1,000 Implemented
WV0447 # 06 Y:2012 06 2012 IMPROVE LUBRICATION PRACTICES $3,030 $4,842 Not Implemented
WV0447 # 10 Y:2012 10 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,330 $0 Implemented
WV0447 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $11,493 $20,750 Not Implemented
WV0447 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,404 $3,320 Not Implemented
WV0447 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $28,677 Not Implemented
WV0447 # 04 Y:2012 04 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,524 $11,830 Not Implemented
WV0447 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,442 $770 Not Implemented
MI0180 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,220 $1,210 Implemented
MI0180 # 05 Y:2009 05 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,302 $4,531 Not Implemented
MI0180 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $51,365 $2,000 Implemented
MI0180 # 03 Y:2009 03 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,931 $10,320 Not Implemented
MI0180 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $40 Implemented
MI0180 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $62,188 $3,320 Implemented
LE0215 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,127 $115,500 Implemented
LE0215 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,899 $320 Not Implemented
LE0215 # 03 Y:2005 03 2005 BURN WASTE OIL FOR HEAT $11,172 $3,000 Not Implemented
LE0215 # 04 Y:2005 04 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,220 $1,588 Implemented
LE0215 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,903 $5,000 Not Implemented
LE0215 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,894 $480 Not Implemented
LE0215 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,801 $2,000 Not Implemented