IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

778

matching recommendations
Reset
SIC 2819 Industrial Inorganic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0635 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,170 $11,190 Not Implemented
CO0635 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,050 $4,130 Implemented
CO0635 # 06 Y:2010 06 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,760 $10,240 Not Implemented
LL0313 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $131,164 $15,480 Not Implemented
LL0313 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $16,960 $2,380 Not Implemented
LL0313 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,891 $2,500 Not Implemented
LL0313 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,563 $7,800 Not Implemented
LL0313 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $425 $330 Not Implemented
LL0313 # 06 Y:2009 06 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $316 $270 Not Implemented
AM0540 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $700,000 $117,000 Implemented
AM0540 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $97,610 $1,000 Implemented
AM0540 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,800 $3,000 Implemented
AM0540 # 04 Y:2008 04 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $15,410 $5,000 Implemented
AM0540 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $12,850 $2,000 Implemented
AM0540 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $5,820 $0 Implemented
AM0540 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $980 $715 Implemented
DL0009 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $28,059 $10,000 Implemented
DL0009 # 02 Y:2007 02 2007 REDESIGN PROCESS $15,567 $6,300 Not Implemented
DL0009 # 03 Y:2007 03 2007 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $11,200 $60,000 Not Implemented
DL0009 # 04 Y:2007 04 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,793 $11,313 Not Implemented
DL0009 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,192 $50,000 Implemented
DL0009 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,454 $0 Not Implemented
DL0009 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,890 $695 Implemented
DL0009 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,941 $590 Not Implemented
DL0009 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,924 $3,809 Implemented