IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

778

matching recommendations
Reset
SIC 2819 Industrial Inorganic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0111 # 12 Y:2006 12 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,671 $195,432 Implemented
IC0103 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,792 $12,792 Not Implemented
IC0103 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $8,631 $4,680 Not Implemented
IC0103 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,344 $1,400 Not Implemented
IC0103 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,340 $300 Not Implemented
IC0103 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $240 $0 Not Implemented
IC0103 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,336 $941 Not Implemented
IC0103 # 07 Y:2005 07 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $330 $2,800 Not Implemented
IC0103 # 08 Y:2005 08 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $104 $256 Not Implemented
MS0256 # 01 Y:2004 01 2004 INSTALL HYDROGEN FUEL CELL $711,668 $7,500,000 n/a
MS0256 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $53,846 $54,000 n/a
MS0256 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,367 $1,000 Implemented
MS0256 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,725 $3,794 Implemented
MS0256 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,059 $11,743 Not Implemented
MS0256 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,126 $422 Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented
TA0088 # 02 Y:2004 02 2004 USE OPTIMUM THICKNESS INSULATION $86,400 $1,610 Not Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $20,580 $15,340 Not Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented
TA0088 # 08 Y:2004 08 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,000 $0 Not Implemented
UD0704 # 01 Y:2004 01 2004 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,368 $0 Implemented
UD0704 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $3,335 $6,000 Not Implemented