Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
795
matching recommendationsSIC | 2819 | Industrial Inorganic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0192 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,251 | $1,567 | Implemented |
AR0192 # 03 Y:2000 | 03 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,515 | $0 | Not Implemented |
AR0192 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $492 | $1,426 | Implemented |
AR0192 # 05 Y:2000 | 05 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,496 | $24,000 | Implemented |
AR0192 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $160,000 | $45,600 | Implemented |
NV0164 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $95,346 | $200 | n/a |
NV0164 # 02 Y:2000 | 02 | 2000 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $75,664 | $100 | n/a |
NV0164 # 03 Y:2000 | 03 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,258 | $0 | n/a |
NV0164 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,704 | $150 | n/a |
NV0164 # 05 Y:2000 | 05 | 2000 | MODIFY WORKLOAD | $8,134 | $0 | n/a |
NV0164 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $137,083 | $45,279 | n/a |
NV0164 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $6,651 | $432 | n/a |
NV0164 # 08 Y:2000 | 08 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $984 | $100 | n/a |
NV0163 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,021 | $2,398 | n/a |
NV0163 # 02 Y:2000 | 02 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,105 | $675 | n/a |
NV0163 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,756 | $0 | n/a |
NV0163 # 04 Y:2000 | 04 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $106,434 | $41,000 | n/a |
NV0163 # 05 Y:2000 | 05 | 2000 | UPGRADE OBSOLETE EQUIPMENT | $49,184 | $25,969 | n/a |
BD0166 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,357 | $2,000 | Not Implemented |
BD0166 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $2,182 | $2,700 | Implemented |
BD0166 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,263 | $0 | Not Implemented |
BD0166 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $823 | $500 | Implemented |
BD0166 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $594 | $1,000 | Not Implemented |
BD0166 # 06 Y:2000 | 06 | 2000 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $380,939 | $600,000 | Not Implemented |
BD0166 # 07 Y:2000 | 07 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $33,228 | $35,000 | Implemented |