IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 2819 Industrial Inorganic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0112 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,900 $40,000 Implemented
DL0112 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,034 $13,739 Implemented
LE0123 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,468 $2,500 Implemented
LE0123 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $57,598 $6,000 Implemented
LE0123 # 04 Y:2001 04 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $13,548 $0 Implemented
HO0189 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,434 $10,179 Implemented
HO0189 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $6,631 $10,500 Implemented
HO0189 # 05 Y:1998 05 1998 $9,400 $500 Implemented
HO0189 # 06 Y:1998 06 1998 MINIMIZE WATER USAGE $2,000 $2,000 Implemented
RU0105 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,748 $6,800 Implemented
RU0105 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,169 $500 Implemented
RU0105 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $291 $72 Implemented
RU0045 # 01 Y:1988 01 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,025 $0 Implemented
RU0045 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $549 $1,038 Implemented
RU0045 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $596 $500 Implemented