Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 2819 | Industrial Inorganic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0669 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,442 | $5,225 | Implemented |
WV0669 # 17 Y:2024 | 17 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $135 | $363 | Implemented |
WV0669 # 16 Y:2024 | 16 | 2024 | INSULATE BARE EQUIPMENT | $357 | $798 | Implemented |
WV0669 # 15 Y:2024 | 15 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $397 | $1,920 | Not Implemented |
WV0669 # 14 Y:2024 | 14 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $843 | $1,200 | Implemented |
WV0669 # 13 Y:2024 | 13 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,227 | $5,535 | Implemented |
WV0669 # 12 Y:2024 | 12 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,463 | $1,143 | Implemented |
WV0669 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,467 | $940 | Implemented |
WV0669 # 10 Y:2024 | 10 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,422 | $7,600 | Not Implemented |
WV0669 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,954 | $10,900 | Not Implemented |
WV0669 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,886 | $1,088 | Implemented |
WV0669 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,194 | $16,795 | Not Implemented |
WV0669 # 06 Y:2024 | 06 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,200 | $11,000 | Not Implemented |
WV0669 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,542 | $14,640 | Not Implemented |
WV0669 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,909 | $6,900 | Not Implemented |
WV0669 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,884 | $35,717 | Not Implemented |
WV0669 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $19,270 | $9,950 | Implemented |
UC2407 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,641 | $633,762 | n/a |
UC2407 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $115,385 | $54,067 | n/a |
UC2407 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,041 | $5,000 | n/a |
UC2407 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $588 | $1,300 | n/a |
UC2407 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $504 | $75 | n/a |
UC2407 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,157 | $100 | n/a |
UC2407 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $123 | $139 | n/a |
UC2407 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $208 | $0 | n/a |