Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,517
matching recommendationsSIC | 282 | Plastics Materials And Synthetics |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0420 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,200 | $0 | Not Implemented |
AM0420 # 06 Y:2002 | 06 | 2002 | REPAIR OR REPLACE STEAM TRAPS | $3,300 | $900 | Implemented |
AM0420 # 07 Y:2002 | 07 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,000 | $1,800 | Not Implemented |
AM0420 # 08 Y:2002 | 08 | 2002 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,500 | $150 | Implemented |
AM0420 # 09 Y:2002 | 09 | 2002 | USE PHOTOCELL CONTROLS | $1,500 | $2,300 | Implemented |
AM0420 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $700 | $0 | Implemented |
UF0306 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,153 | $5,064 | Implemented |
UF0306 # 02 Y:2002 | 02 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,764 | $7,800 | Not Implemented |
UF0306 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,327 | $0 | Implemented |
UF0306 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $592,558 | $1,120,000 | Not Implemented |
UF0306 # 05 Y:2002 | 05 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $10,048 | $0 | Not Implemented |
UF0306 # 06 Y:2002 | 06 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $48,671 | $1,074 | Not Implemented |
UF0306 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $208,938 | $33,980 | Not Implemented |
UF0306 # 08 Y:2002 | 08 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $107,170 | $114,485 | Not Implemented |
MA0513 # 01 Y:2002 | 01 | 2002 | USE MINIMUM SAFE OVEN VENTILATION | $10,252 | $10,000 | Not Implemented |
MA0513 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,583 | $10,000 | Not Implemented |
MA0513 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,565 | $0 | Implemented |
MA0513 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,070 | $1,000 | Implemented |
MA0513 # 05 Y:2002 | 05 | 2002 | BURN A LESS EXPENSIVE GRADE OF FUEL | $680 | $5,000 | Not Implemented |
MA0513 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $236 | $500 | Implemented |
LL0134 # 01 Y:2002 | 01 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,548 | $0 | Not Implemented |
LL0134 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,068 | $210 | Implemented |
LL0134 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $1,100 | $364 | Not Implemented |
LL0134 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $90 | Implemented |
LL0134 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $167 | $30 | Implemented |