Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 282 | Plastics Materials And Synthetics |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0648 # 11 Y:2002 | 11 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,458 | $702 | Not Implemented |
OK0648 # 01 Y:2002 | 01 | 2002 | USE OPTIMUM THICKNESS INSULATION | $12,108 | $2,317 | Implemented |
OK0648 # 02 Y:2002 | 02 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $38,422 | $70,536 | Not Implemented |
OK0648 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,590 | $4,344 | Not Implemented |
OK0648 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,975 | $4,500 | Implemented |
OK0648 # 05 Y:2002 | 05 | 2002 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $6,955 | $22,000 | Not Implemented |
OK0648 # 06 Y:2002 | 06 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $59,232 | $12,200 | n/a |
OK0648 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,683 | $240 | Implemented |
OK0648 # 08 Y:2002 | 08 | 2002 | INSTALL OCCUPANCY SENSORS | $94 | $288 | Not Implemented |
OK0648 # 09 Y:2002 | 09 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $169,242 | $37,910 | n/a |
OK0648 # 10 Y:2002 | 10 | 2002 | COVER OPEN TANKS | $1,983 | $752 | Not Implemented |
AM0420 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $700 | $0 | Implemented |
AM0420 # 04 Y:2002 | 04 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $49,000 | $0 | Not Implemented |
AM0420 # 01 Y:2002 | 01 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $656,000 | $3,400,000 | n/a |
AM0420 # 08 Y:2002 | 08 | 2002 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,500 | $150 | Implemented |
AM0420 # 09 Y:2002 | 09 | 2002 | USE PHOTOCELL CONTROLS | $1,500 | $2,300 | Implemented |
AM0420 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $58,000 | $52,000 | Not Implemented |
AM0420 # 06 Y:2002 | 06 | 2002 | REPAIR OR REPLACE STEAM TRAPS | $3,300 | $900 | Implemented |
AM0420 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $58,000 | $0 | Implemented |
AM0420 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,200 | $0 | Not Implemented |
AM0420 # 07 Y:2002 | 07 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,000 | $1,800 | Not Implemented |
UF0306 # 06 Y:2002 | 06 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $48,671 | $1,074 | Not Implemented |
UF0306 # 02 Y:2002 | 02 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,764 | $7,800 | Not Implemented |
UF0306 # 08 Y:2002 | 08 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $107,170 | $114,485 | Not Implemented |
UF0306 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $208,938 | $33,980 | Not Implemented |