Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0128 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $18,200 | $12,560 | Implemented |
DL0128 # 05 Y:2014 | 05 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,000 | $20,000 | Implemented |
DL0118 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $13,600 | $800 | Not Implemented |
DL0118 # 11 Y:2013 | 11 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,300 | $700 | Not Implemented |
DL0118 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $3,600 | $1,000 | Implemented |
DL0118 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,504 | $20,000 | Implemented |
DL0118 # 08 Y:2013 | 08 | 2013 | INSULATE BARE EQUIPMENT | $2,400 | $330 | Not Implemented |
DL0118 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,362 | $4,680 | Not Implemented |
DL0118 # 06 Y:2013 | 06 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,500 | $0 | Implemented |
DL0118 # 05 Y:2013 | 05 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,900 | $300 | Not Implemented |
DL0118 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,300 | $3,000 | Implemented |
DL0118 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,500 | $349,314 | Implemented |
DL0118 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,600 | $16,500 | Not Implemented |
DL0025 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,600 | $0 | Not Implemented |
DL0025 # 01 Y:2008 | 01 | 2008 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $1,078 | $0 | Not Implemented |
DL0025 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,976 | $0 | Implemented |
DL0025 # 06 Y:2008 | 06 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $3,964 | $0 | Not Implemented |
DL0025 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,919 | $30,000 | Implemented |
DL0025 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $36,900 | $0 | Implemented |
DL0017 # 02 Y:2008 | 02 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $738 | $0 | Not Implemented |
DL0017 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,572 | $165,000 | Not Implemented |
DL0017 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,006 | $26,496 | Implemented |
DL0017 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $6,100 | $12,100 | Not Implemented |
DL0017 # 03 Y:2008 | 03 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,007 | $800 | Implemented |
DL0017 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,841 | $0 | Not Implemented |