Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,246
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0017 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,572 | $165,000 | Not Implemented |
DL0013 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,300 | $0 | Implemented |
DL0013 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $2,396 | $285 | Implemented |
DL0013 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $108,300 | $104,800 | Implemented |
DL0013 # 04 Y:2008 | 04 | 2008 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $24,218 | $25,000 | Implemented |
DL0013 # 05 Y:2008 | 05 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,700 | $10,000 | Implemented |
UD0767 # 01 Y:2007 | 01 | 2007 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $30,284 | $1,500 | Implemented |
UD0767 # 02 Y:2007 | 02 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $20,419 | $17,235 | Not Implemented |
UD0767 # 03 Y:2007 | 03 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $14,876 | $0 | Not Implemented |
UD0767 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,731 | $33,190 | Not Implemented |
UD0767 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,309 | $7,740 | Not Implemented |
UD0767 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $2,922 | $5,000 | Not Implemented |
UD0767 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,625 | $2,175 | Implemented |
UD0767 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,139 | $5,050 | Not Implemented |
LL0279 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $132,215 | $49,640 | Implemented |
LL0279 # 02 Y:2007 | 02 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $25,889 | $5,250 | Not Implemented |
LL0279 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,724 | $40,000 | Not Implemented |
LL0279 # 04 Y:2007 | 04 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,145 | $2,490 | Not Implemented |
LL0279 # 05 Y:2007 | 05 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,945 | $3,767 | Not Implemented |
LL0279 # 06 Y:2007 | 06 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,535 | $30 | Not Implemented |
LL0279 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $1,451 | $840 | Not Implemented |
LL0279 # 08 Y:2007 | 08 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,151 | $1,580 | Not Implemented |
UD0755 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $73,500 | $147,000 | Implemented |
UD0755 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,728 | $10,396 | Implemented |
UD0755 # 03 Y:2007 | 03 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $49,140 | $253,091 | Not Implemented |