IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0275 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $760 $310 n/a
UA0275 # 04 Y:2023 04 2023 INSTALL TIMERS AND/OR THERMOSTATS $824 $227 n/a
UA0275 # 03 Y:2023 03 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,448 $4,532 n/a
UA0275 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,695 $11,361 n/a
UA0275 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $2,032 $377 n/a
UA0273 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,327 $500 n/a
UA0273 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $913 $3,015 n/a
UA0273 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,195 $2,890 n/a
UA0273 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,016 $211 n/a
UA0273 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418,766 $1,440,000 n/a
UA0047 # 01 Y:2010 01 2010 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $427,575 $685,000 Not Implemented
UA0047 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,140 $713 Not Implemented
UA0047 # 06 Y:2010 06 2010 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $155,078 $222,874 Not Implemented
UA0047 # 05 Y:2010 05 2010 MINIMIZE WATER USAGE $12,306 $8,325 Implemented
UA0047 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,938 $75,000 Not Implemented
UA0047 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,635 $740 Not Implemented
UA0047 # 02 Y:2010 02 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,473 $0 Not Implemented