Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0248 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,209 | $291 | n/a |
DL0248 # 01 Y:2025 | 01 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,580 | $0 | n/a |
DL0248 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $5,964 | $373 | n/a |
DL0248 # 05 Y:2025 | 05 | 2025 | USE OPTIMUM TEMPERATURE | $1,534 | $550 | n/a |
DL0248 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,139 | $10,680 | n/a |
DL0248 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,995 | $4,980 | n/a |
DL0248 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $771 | $736 | n/a |
DL0184 # 05 Y:2020 | 05 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,500 | $1,400 | Not Implemented |
DL0184 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $4,400 | $4,750 | Not Implemented |
DL0184 # 11 Y:2020 | 11 | 2020 | REDUCE VENTILATION AIR | $940 | $0 | Implemented |
DL0184 # 10 Y:2020 | 10 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,390 | $3,079 | Implemented |
DL0184 # 09 Y:2020 | 09 | 2020 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $240 | $40 | Not Implemented |
DL0184 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $2,680 | $152 | Not Implemented |
DL0184 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $800 | $95 | Not Implemented |
DL0184 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,170 | $4,250 | Not Implemented |
DL0184 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,700 | $6,337 | Not Implemented |
DL0184 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,300 | $15,661 | Implemented |
DL0184 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,702 | $0 | Not Implemented |
DL0184 # 12 Y:2020 | 12 | 2020 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,215 | $400 | Implemented |
DL0174 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,500 | $25,000 | Not Implemented |
DL0174 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,170 | $4,000 | Not Implemented |
DL0174 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,710 | $18,000 | Not Implemented |
DL0174 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,810 | $6,000 | Not Implemented |
DL0174 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,550 | $8,000 | Not Implemented |
DL0174 # 06 Y:2017 | 06 | 2017 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $10,800 | $0 | Not Implemented |